What is Earned Value Management?

EVM is much more than just percentage complete. To fully understand the current status and health of a project, this PMI-favored technique offers more than a dozen formulas, each giving a microscopic view of one aspect of the project. Taken together, they provide the full spectrum of how your project is performing on metrics: Time, Cost and Scope (a.k.a., “The triple constraint”).

Five Ways My book The PM Answer Book helps with Earned Value

  1. I devote 22 pages to Earned Value in my Cost Management chapter.
  2. I walk through every EVM formula, using one easy-to-follow example of a project everyone can relate to: building a website with 4 web-pages.
  3. In addition to a detailed explanation of how each calculation is done, I also provide a box showing: “What this answer tells the PM” — this is valuable for the SCENARIO-BASED questions on the test (where it’s important to understand the purpose of each formula, not just the math)
  4. I provide a proven method I’ve come up with for memorizing the formulas:
  • I break the 6 key EVM formulas into 3 logical pairs, and
  • I also break the 6 key inputs to the formulas into 3 logical pairs

5. I provide a Fill-In-The-Blanks grid as a “Work Sheet” to help readers study and memorize the formulas (for your “Brain Dump” for the test)